Project 03 · Business Equipment
Furniture, a reception desk and display fixtures from several suppliers — arriving together, in time for the opening.
The project story
The new branch had a fixed opening date, and the equipment came from several different suppliers. A delay at any one supplier could have pushed back the entire opening.
We built a single schedule for all suppliers, consolidated the goods at a collection warehouse in the country of origin and shipped them together, with an inspection before loading.
All the equipment arrived together and on time, and was unloaded directly at the branch in installation order.
What we did, step by step
Every project goes through the same structured steps, so you always know where the order stands.
A complete equipment list based on the branch plan and the opening schedule.
Allocating items among suitable suppliers and comparing quotes.
Approving finish, color and size samples.
Tracking production with each supplier and consolidating at a collection warehouse.
Consolidated shipment, customs release and coordinating unloading at the branch.
Gallery
Illustrative images from the project. Click an image to enlarge.
[A client quote about the project will appear here, only after we receive their approval to publish.]